IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0522 # 03 Y:2007 03 2007 $14,500 $10,000 Not Implemented
OR0522 # 01 Y:2007 01 2007 $70,700 $200,000 Not Implemented
OR0522 # 02 Y:2007 02 2007 $49,400 $51,300 Not Implemented
OR0522 # 04 Y:2007 04 2007 $900 $3,450 Not Implemented
OR0521 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $7,100 $45,000 Implemented
OR0521 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,250 $9,300 Implemented
OR0521 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $27,800 $12,500 Implemented
OR0521 # 09 Y:2007 09 2007 INSTALL OCCUPANCY SENSORS $3,720 $5,100 Implemented
OR0521 # 10 Y:2007 10 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,600 $4,500 Implemented
OR0521 # 11 Y:2007 11 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,900 $1,800 Implemented
OR0521 # 01 Y:2007 01 2007 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $92,300 $44,300 Implemented
OR0521 # 02 Y:2007 02 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $37,000 $20,600 Implemented
OR0521 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,600 $9,600 Implemented
OR0521 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,300 $0 Implemented
OR0521 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $27,300 $0 Implemented
OR0519 # 13 Y:2007 13 2007 INSTALL SKYLIGHTS $37,300 $170,250 Not Implemented
OR0519 # 12 Y:2007 12 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,500 $16,000 Not Implemented
OR0519 # 10 Y:2007 10 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $42,000 $61,300 Not Implemented
OR0519 # 09 Y:2007 09 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,500 $109,300 Implemented
OR0519 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,400 $12,400 Implemented
OR0519 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $52,800 $40,500 Implemented
OR0519 # 06 Y:2007 06 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $102,000 $33,700 Implemented
OR0519 # 05 Y:2007 05 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,700 $35,900 Implemented
OR0519 # 01 Y:2007 01 2007 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,658,000 $660,000 Not Implemented
OR0519 # 03 Y:2007 03 2007 USE OPTIMUM THICKNESS INSULATION $86,900 $380,160 Not Implemented