Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
92
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0540 # 08 Y:2008 | 08 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $341 | $0 | Not Implemented |
OR0540 # 01 Y:2008 | 01 | 2008 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $29 | $10,000 | Implemented |
OR0540 # 05 Y:2008 | 05 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $434 | $12,400 | Not Implemented |
OR0540 # 04 Y:2008 | 04 | 2008 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,433 | $257,380 | Not Implemented |
OR0540 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $2,932 | $13,049 | Implemented |
OR0540 # 02 Y:2008 | 02 | 2008 | INCREASE AMOUNT OF CONDENSATE RETURNED | $14,149 | $6,100 | Implemented |
OR0540 # 06 Y:2008 | 06 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,216 | $0 | Not Implemented |
OR0540 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $699 | $1,398 | Not Implemented |
OR0539 # 04 Y:2008 | 04 | 2008 | USE SOLAR HEAT TO MAKE ELECTRICTY | $106,649 | $758,330 | Not Implemented |
OR0539 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $87,200 | $43,600 | Not Implemented |
OR0539 # 11 Y:2008 | 11 | 2008 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $52,540 | $2,200 | Not Implemented |
OR0539 # 13 Y:2008 | 13 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $7,300 | $5,700 | Not Implemented |
OR0539 # 02 Y:2008 | 02 | 2008 | USE EXISTING DAM TO GENERATE ELECTRICITY | $31,589 | $50,000 | Not Implemented |
OR0539 # 09 Y:2008 | 09 | 2008 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $78,900 | $132,800 | Not Implemented |
OR0539 # 06 Y:2008 | 06 | 2008 | OPTIMIZE PLANT POWER FACTOR | $4,450 | $19,950 | Not Implemented |
OR0539 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,510 | $0 | Not Implemented |
OR0539 # 07 Y:2008 | 07 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,860 | $0 | Not Implemented |
OR0539 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $5,432 | $23,075 | Not Implemented |
OR0539 # 05 Y:2008 | 05 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,317 | $72,600 | Not Implemented |
OR0539 # 01 Y:2008 | 01 | 2008 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $218,543 | $1,128,211 | Not Implemented |
OR0539 # 12 Y:2008 | 12 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $46,700 | $46,700 | Not Implemented |
OR0538 # 03 Y:2008 | 03 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $433,305 | $300,000 | Not Implemented |
OR0538 # 06 Y:2008 | 06 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $16,035 | $16,204 | Not Implemented |
OR0538 # 04 Y:2008 | 04 | 2008 | INSTALL SENSORS TO DETECT DEFECTS | $132,288 | $140,000 | Not Implemented |
OR0538 # 05 Y:2008 | 05 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,546 | $7,085 | Not Implemented |