Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
495
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0806 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $3,880 | $211 | n/a |
OR0806 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,788 | $960,069 | n/a |
OR0806 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,542 | $5,699 | n/a |
OR0806 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,490 | $1,927 | n/a |
OR0806 # 05 Y:2025 | 05 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $15,683 | $76,301 | n/a |
OR0805 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $103,946 | $1,750,000 | n/a |
OR0805 # 05 Y:2025 | 05 | 2025 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $5,605 | $0 | n/a |
OR0805 # 01 Y:2025 | 01 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,892 | $0 | n/a |
OR0805 # 02 Y:2025 | 02 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,187 | $0 | n/a |
OR0805 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,157 | $3,706 | n/a |
OR0805 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $928 | $0 | n/a |
ORC016 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $14,324 | $1,894 | n/a |
ORC016 # 03 Y:2025 | 03 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $90,790 | $266,383 | n/a |
ORC016 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,757 | $18,123 | n/a |
ORC016 # 04 Y:2025 | 04 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $838 | $7,000 | n/a |
OR0804 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,678 | $51,877 | n/a |
OR0804 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,473 | $22,751 | n/a |
OR0804 # 02 Y:2024 | 02 | 2024 | INCREASE EFFICIENCY OF TRUCKS | $473,339 | $1,593,482 | n/a |
OR0804 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $634 | $0 | n/a |
OR0804 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $4,359 | $4,063 | n/a |
OR0804 # 03 Y:2024 | 03 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,548 | $0 | n/a |
OR0803 # 01 Y:2024 | 01 | 2024 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $79,249 | $259,200 | n/a |
OR0803 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,111 | $0 | n/a |
OR0803 # 03 Y:2024 | 03 | 2024 | USE OPTIMUM TEMPERATURE | $6,284 | $0 | n/a |
OR0803 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $1,811 | $4,166 | n/a |