IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

151

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0215 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $2,626 $2,800 Not Implemented
OR0215 # 04 Y:1994 04 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $207 $1,667 Not Implemented
OR0215 # 05 Y:1994 05 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $652 $500 Implemented
OR0212 # 01 Y:1994 01 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,043 $0 Not Implemented
OR0212 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,121 $1,763 Implemented
OR0212 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,007 $12,425 Not Implemented
OR0212 # 04 Y:1994 04 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $69,996 $30,000 Implemented
OR0212 # 05 Y:1994 05 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $51,397 $0 Not Implemented
OR0212 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $11,009 $45,344 Not Implemented
OR0212 # 07 Y:1994 07 1994 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $153,000 $106,000 Implemented
OR0211 # 01 Y:1994 01 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $872 $643 Implemented
OR0211 # 02 Y:1994 02 1994 USE PHOTOCELL CONTROLS $152 $50 Implemented
OR0211 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $711 $364 Implemented
OR0211 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $236 $427 Implemented
OR0211 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $308 $978 Implemented
OR0211 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $2,527 $2,400 Implemented
OR0211 # 07 Y:1994 07 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,967 $12,300 Implemented
OR0211 # 08 Y:1994 08 1994 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $196 $900 Implemented
OR0211 # 09 Y:1994 09 1994 REDUCE FLUID FLOW RATES $6,185 $7,611 Implemented
OR0211 # 10 Y:1994 10 1994 RECOVER AND REUSE COOLING WATER $1,787 $2,824 Not Implemented
OR0210 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $1,701 $1,030 Not Implemented
OR0210 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $220 $300 Implemented
OR0210 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43 $139 Implemented
OR0210 # 04 Y:1994 04 1994 USE A DIFFERENT OR RECYCLED RAW MATERIAL $124,000 $118,900 Implemented
OR0209 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $750 Not Implemented