IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0505 # 05 Y:2006 05 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,760 $2,700 Not Implemented
OR0507 # 06 Y:2006 06 2006 $60,100 $41,100 Implemented
OR0507 # 15 Y:2006 15 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,890 $19,200 Implemented
OR0507 # 08 Y:2006 08 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $32,400 $23,200 Not Implemented
OR0507 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $1,600 $1,200 Not Implemented
OR0507 # 12 Y:2006 12 2006 $61,100 $85 Not Implemented
OR0507 # 13 Y:2006 13 2006 OPTIMIZE PLANT POWER FACTOR $6,600 $10,500 Not Implemented
OR0507 # 14 Y:2006 14 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,300 $5 Not Implemented
OR0507 # 05 Y:2006 05 2006 $40,000 $1,500 Implemented
OR0505 # 01 Y:2006 01 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $18,900 $0 Implemented
OR0507 # 11 Y:2006 11 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,800 $2,600 Not Implemented
OR0505 # 06 Y:2006 06 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,000 $8,000 Not Implemented
OR0507 # 16 Y:2006 16 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $77,400 $330,000 Not Implemented
OR0505 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,300 $600 Not Implemented
OR0505 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,000 $0 Not Implemented
OR0505 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,600 $0 Implemented
OR0505 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,000 $1,000 Not Implemented
OR0505 # 08 Y:2006 08 2006 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $168,270 $185,000 Implemented
OR0507 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $2,100 $2,100 Not Implemented
OR0505 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,100 $32,300 Not Implemented
OR0507 # 04 Y:2006 04 2006 KEEP BOILER TUBES CLEAN $13,700 $4,000 Implemented
OR0507 # 10 Y:2006 10 2006 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $22,760 $24,900 Implemented
OR0507 # 01 Y:2006 01 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,600 $0 Implemented
OR0507 # 02 Y:2006 02 2006 $46,800 $2,000 Implemented
OR0507 # 03 Y:2006 03 2006 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $13,600 $3,200 Not Implemented