Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1105 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $4,117 | $7,200 | n/a |
UD1105 # 03 Y:2025 | 03 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $854 | $5,000 | n/a |
UD1105 # 02 Y:2025 | 02 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $990 | $3,800 | n/a |
UD1105 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,991 | $373,800 | n/a |
UD1104 # 01 Y:2025 | 01 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,586 | $21,450 | n/a |
UD1104 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,258 | $5,000 | n/a |
UD1104 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,793 | $92,400 | n/a |
UD1103 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,580 | $273,000 | n/a |
UD1103 # 05 Y:2025 | 05 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $6,351 | $81,000 | n/a |
UD1103 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,186 | $3,750 | n/a |
UD1103 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $11,529 | $28,000 | n/a |
UD1103 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $356 | $110 | n/a |
UD1100 # 03 Y:2025 | 03 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $879 | $0 | n/a |
UD1100 # 02 Y:2025 | 02 | 2025 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,520 | $1,237 | n/a |
UD1100 # 01 Y:2025 | 01 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $118 | $0 | n/a |
UD1100 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $5,242 | $7,768 | n/a |
UD1100 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $12,387 | $23,400 | n/a |
UD1100 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,770 | $1,235 | n/a |
UD1100 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,007 | $15,430 | n/a |
UD1100 # 06 Y:2025 | 06 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,587 | $0 | n/a |
UD1099 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $2,877 | $3,498 | n/a |
UD1099 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $283 | $953 | n/a |
UD1099 # 07 Y:2025 | 07 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,580 | $5,371 | n/a |
UD1099 # 05 Y:2025 | 05 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,633 | $1,322 | n/a |
UD1099 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $568 | $0 | n/a |