Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,045
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1110 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,182 | $953 | n/a |
UD1110 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,927 | $8,803 | n/a |
UD1110 # 08 Y:2025 | 08 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,078 | $19,900 | n/a |
UD1110 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,358 | $0 | n/a |
UD1110 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,733 | $17,500 | n/a |
UD1110 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $961 | $0 | n/a |
UD1110 # 06 Y:2025 | 06 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,326 | $4,060 | n/a |
UD1110 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,072 | $1,464 | n/a |
UD1110 # 09 Y:2025 | 09 | 2025 | OPTIMIZE PLANT POWER FACTOR | $27,844 | $76,225 | n/a |
UD1109 # 04 Y:2025 | 04 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $41,149 | $75,000 | n/a |
UD1109 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,579 | $0 | n/a |
UD1109 # 01 Y:2025 | 01 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,965 | $2,310 | n/a |
UD1109 # 05 Y:2025 | 05 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,167 | $4,639 | n/a |
UD1109 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,017 | $2,784 | n/a |
WV0678 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,707 | $41,750 | n/a |
WV0678 # 04 Y:2025 | 04 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,735 | $5,200 | n/a |
UD1107 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $412 | $900 | n/a |
UD1107 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,839 | $5,280 | n/a |
WV0678 # 19 Y:2025 | 19 | 2025 | REDUCE VENTILATION AIR | $631 | $2,400 | n/a |
WV0678 # 06 Y:2025 | 06 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,185 | $11,425 | n/a |
WV0678 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $22,738 | $38,304 | n/a |
WV0678 # 01 Y:2025 | 01 | 2025 | MINIMIZE WATER USAGE | $16,085 | $31,231 | n/a |
UD1107 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $69,274 | $0 | n/a |
UD1107 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $228,685 | $136,500 | n/a |
UD1107 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,345 | $953 | n/a |