IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0731 # 01 Y:2005 01 2005 $54,200 $60,000 Implemented
UD0731 # 13 Y:2005 13 2005 UPGRADE CONTROLS ON COMPRESSORS $1,894 $0 Implemented
UD0731 # 12 Y:2005 12 2005 REDUCE VENTILATION AIR $1,932 $119 Not Implemented
UD0731 # 11 Y:2005 11 2005 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $4,182 $0 Not Implemented
UD0731 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,953 $15,113 Implemented
UD0731 # 09 Y:2005 09 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,841 $0 Implemented
UD0731 # 08 Y:2005 08 2005 UPGRADE CONTROLS ON COMPRESSORS $9,619 $520 Not Implemented
UD0731 # 07 Y:2005 07 2005 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $12,378 $0 Implemented
UD0731 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,130 $0 Not Implemented
UD0731 # 05 Y:2005 05 2005 $13,200 $0 Not Implemented
UD0731 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,198 $0 Not Implemented
UD0731 # 03 Y:2005 03 2005 USE POWER DURING OFF-PEAK PERIODS $24,427 $0 Not Implemented
UD0731 # 02 Y:2005 02 2005 $28,800 $0 Not Implemented
UD0731 # 14 Y:2005 14 2005 UPGRADE CONTROLS ON COMPRESSORS $1,010 $0 Implemented
UD0731 # 15 Y:2005 15 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $622 $0 Implemented
UD0731 # 16 Y:2005 16 2005 DISCONNECT BALLASTS $440 $66 Not Implemented
UD0717 # 01 Y:2005 01 2005 INCREASE USE OF AUTOMATION $68,000 $145,000 Implemented
UD0717 # 12 Y:2005 12 2005 INSULATE BARE EQUIPMENT $670 $780 Not Implemented
UD0717 # 11 Y:2005 11 2005 USE OPTIMUM THICKNESS INSULATION $1,314 $1,962 Not Implemented
UD0717 # 09 Y:2005 09 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,658 $2,526 Implemented
UD0717 # 08 Y:2005 08 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,395 $0 Not Implemented
UD0717 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,225 $0 Implemented
UD0717 # 05 Y:2005 05 2005 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $12,000 $2,300 Not Implemented
UD0717 # 04 Y:2005 04 2005 REPAIR OR REPLACE STEAM TRAPS $12,702 $5,400 Implemented
UD0717 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,783 $39,200 Implemented