IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 3371 Household and Institutional Furniture and Kitchen Cabinet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0547 # 05 Y:2023 05 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $6,147 $30,000 Not Implemented
LE0547 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,448 $13,930 Implemented
LE0547 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $602 $1,720 Implemented
LE0547 # 02 Y:2023 02 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,446 $1,500 Not Implemented
LE0547 # 01 Y:2023 01 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $846 $400 Implemented
LE0324 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $530 Not Implemented
LE0324 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $1,778 $416 Not Implemented
LE0324 # 06 Y:2011 06 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,832 $7,000 Not Implemented
LE0324 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,126 $26,983 Not Implemented
LE0324 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,665 $400 Not Implemented
LE0324 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,830 $28,998 Not Implemented
LE0324 # 02 Y:2011 02 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,133 $5,085 Not Implemented
LE0324 # 01 Y:2011 01 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,284 $122,400 Not Implemented
LE0295 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $1,099 $104 Not Implemented
LE0295 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,215 $58,964 Implemented
LE0295 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,513 $1,000 Implemented
LE0295 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,686 $1,840 Implemented
LE0295 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,204 $35,000 Not Implemented
LE0295 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,285 $50,000 Not Implemented
LE0295 # 01 Y:2010 01 2010 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $390,835 $2,640,000 Not Implemented
LE0202 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $220 $0 Implemented
LE0202 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $397 $500 Implemented
LE0202 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $879 $0 Implemented
LE0202 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,378 $2,500 Implemented
LE0202 # 02 Y:2004 02 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,420 $13,640 Implemented