IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0338 # 04 Y:2012 04 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $15,000 $0 Not Implemented
LE0338 # 03 Y:2012 03 2012 REPAIR OR REPLACE STEAM TRAPS $23,903 $1,800 Implemented
LE0314 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,017 $39,066 Not Implemented
LE0314 # 07 Y:2011 07 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,127 $7,000 Not Implemented
LE0314 # 06 Y:2011 06 2011 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,532 $0 Implemented
LE0314 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $4,063 $8,007 Not Implemented
LE0314 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,832 $1,420 Implemented
LE0314 # 03 Y:2011 03 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,295 $15,000 Not Implemented
LE0314 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,409 $580 Implemented
LE0314 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,497 $12,000 Not Implemented
LE0295 # 01 Y:2010 01 2010 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $390,835 $2,640,000 Not Implemented
LE0295 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,285 $50,000 Not Implemented
LE0295 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,204 $35,000 Not Implemented
LE0295 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,686 $1,840 Implemented
LE0295 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,513 $1,000 Implemented
LE0295 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,215 $58,964 Implemented
LE0295 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $1,099 $104 Not Implemented
WV0386 # 07 Y:2008 07 2008 DEVELOP A REPAIR/REPLACE POLICY $2,823 $769 Implemented
WV0386 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $4,653 $920 Implemented
WV0386 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,790 $0 Implemented
WV0386 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,379 $396 Implemented
WV0386 # 12 Y:2008 12 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $884 $1,000 Implemented
WV0386 # 13 Y:2008 13 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $139 $0 Not Implemented
WV0386 # 10 Y:2008 10 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,621 $1,000 Implemented
WV0386 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,548 $50 Implemented