IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

300

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0450 # 04 Y:2012 04 2012 REDESIGN PROCESS $102,043 $230,000 Not Implemented
WV0450 # 05 Y:2012 05 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $97,121 $400,000 Not Implemented
WV0450 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,667 $21,800 Not Implemented
WV0450 # 07 Y:2012 07 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $11,389 $6,500 Implemented
WV0450 # 08 Y:2012 08 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,199 $1,000 Not Implemented
WV0450 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,686 $21,120 Not Implemented
WV0450 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,953 $18,267 Implemented
WV0450 # 11 Y:2012 11 2012 DEVELOP A REPAIR/REPLACE POLICY $8,489 $1,210 Implemented
WV0450 # 12 Y:2012 12 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,314 $3,360 Not Implemented
WV0450 # 13 Y:2012 13 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,764 $1,800 Not Implemented
LE0322 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,515 $1,000 Implemented
LE0322 # 02 Y:2011 02 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,000 $8,500 Implemented
LE0322 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $781 $8,625 Not Implemented
LE0322 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $188 $175 Not Implemented
WV0403 # 01 Y:2010 01 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $45,685 $55,000 Implemented
WV0403 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,050 $52,453 Implemented
WV0403 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,231 $70,410 Implemented
WV0403 # 04 Y:2010 04 2010 IMPROVE LUBRICATION PRACTICES $9,486 $5,823 Not Implemented
WV0403 # 05 Y:2010 05 2010 USE RADIANT HEATER FOR SPOT HEATING $4,543 $20,500 Not Implemented
WV0403 # 06 Y:2010 06 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,610 $8,756 Not Implemented
WV0403 # 07 Y:2010 07 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,357 $8,600 Not Implemented
WV0403 # 08 Y:2010 08 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,342 $10,700 Not Implemented
WV0403 # 09 Y:2010 09 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,274 $1,620 Implemented
WV0403 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,238 $110 Implemented
WV0403 # 11 Y:2010 11 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,180 $748 Implemented