IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

582

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0354 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,533 $21 Implemented
LE0354 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $459 $42 Implemented
LE0353 # 09 Y:2013 09 2013 ADJUST BURNERS FOR EFFICIENT OPERATION $1,051,434 $5,225,000 Not Implemented
LE0353 # 08 Y:2013 08 2013 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,196 $2,200 Implemented
LE0353 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,835 $1,000 Implemented
LE0353 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $15,964 $6,384 Not Implemented
LE0353 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,908 $2,800 Not Implemented
LE0353 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,843 $520 Implemented
LE0353 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,998 $11,700 Implemented
LE0353 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $786 $3,495 Implemented
LE0353 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,972 $8,105 Implemented
LE0349 # 02 Y:2012 02 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $85,383 $310,000 Implemented
LE0349 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,249 $40 Not Implemented
LE0349 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,253 $1,248 Not Implemented
LE0349 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,373 $1,080 Implemented
LE0349 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,052 $200 Implemented
LE0349 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,510 $12,700 Not Implemented
LE0349 # 08 Y:2012 08 2012 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,074 $5,200 Not Implemented
LE0349 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,018 $7,190 Implemented
LE0333 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,510 $7,490 Not Implemented
LE0333 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,876 $12,800 Not Implemented
LE0333 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,424 $1,000 Not Implemented
LE0333 # 04 Y:2012 04 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,111 $14,190 Not Implemented
LE0333 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,865 $1,000 Not Implemented
LE0333 # 06 Y:2012 06 2012 REDUCE HEAT GAIN BY WINDOW TINTING $4,369 $0 Not Implemented