Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

137

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0207 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,328 $8,300 Implemented
LE0207 # 04 Y:2005 04 2005 INSTALL TIMERS AND/OR THERMOSTATS $5,300 $4,500 Not Implemented
LE0207 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,115 $1,000 Implemented
LE0207 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $1,341 $500 Implemented
LE0207 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $500 Implemented
LE0154 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $0 Implemented
LE0154 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,185 $300 Not Implemented
LE0154 # 03 Y:2003 03 2003 REPAIR OR REPLACE STEAM TRAPS $3,519 $3,000 Implemented
LE0154 # 04 Y:2003 04 2003 INSULATE FEEDWATER TANK $363 $183 Not Implemented
LE0154 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $5,016 $2,582 Not Implemented
LE0154 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,485 $750 Implemented
LE0154 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $83 $150 Not Implemented
LE0122 # 01 Y:2001 01 2001 IMPROVE LUBRICATION PRACTICES $2,814 $2,450 Not Implemented
LE0122 # 02 Y:2001 02 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,672 $2,500 Not Implemented
LE0122 # 03 Y:2001 03 2001 BURN A LESS EXPENSIVE GRADE OF FUEL $26,023 $54,800 Not Implemented
LE0122 # 04 Y:2001 04 2001 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $6,091 $0 Not Implemented
LE0122 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,731 $19,320 Not Implemented
LE0120 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $43,479 $7,500 Not Implemented
LE0120 # 02 Y:2001 02 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,995 $1,000 Implemented
LE0120 # 03 Y:2001 03 2001 IMPROVE LUBRICATION PRACTICES $13,290 $800 Implemented
LE0120 # 04 Y:2001 04 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,381 $0 Implemented
LE0120 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $2,562 $200 Implemented
LE0120 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $12,033 $18,460 Not Implemented
WV0057 # 01 Y:1995 01 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $694 $0 Not Implemented
WV0057 # 02 Y:1995 02 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $38,326 $36,000 Not Implemented