Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0553 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,093 | $22,500 | n/a |
LE0553 # 04 Y:2023 | 04 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,974 | $40,000 | n/a |
LE0553 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $561 | $416 | n/a |
LE0553 # 01 Y:2023 | 01 | 2023 | INSULATE BARE EQUIPMENT | $547 | $270 | n/a |
LE0553 # 05 Y:2023 | 05 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,000 | $91,800 | n/a |
LE0552 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,342 | $5,052 | Not Implemented |
LE0552 # 10 Y:2023 | 10 | 2023 | USE SOLAR HEAT TO HEAT WATER | $20,496 | $210,000 | Not Implemented |
LE0552 # 06 Y:2023 | 06 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $12,123 | $35,000 | Not Implemented |
LE0552 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $608 | $100 | Implemented |
LE0552 # 07 Y:2023 | 07 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $448 | $2,100 | Not Implemented |
LE0552 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,712 | $2,500 | Implemented |
LE0552 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $790 | $570 | Implemented |
LE0552 # 09 Y:2023 | 09 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,062 | $48,000 | Implemented |
LE0552 # 08 Y:2023 | 08 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,547 | $10,241 | Not Implemented |
LE0552 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $231 | $320 | Implemented |
LE0551 # 03 Y:2023 | 03 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $111,339 | $525,000 | Implemented |
LE0551 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $203 | $300 | Not Implemented |
LE0551 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $69,768 | $5,000 | Implemented |
LE0550 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $299 | $1,150 | Not Implemented |
LE0550 # 05 Y:2023 | 05 | 2023 | ELIMINATE A BY-PRODUCT | $85,450 | $350,000 | Implemented |
LE0550 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,539 | $3,500 | Implemented |
LE0550 # 06 Y:2023 | 06 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,500 | $22,000 | Not Implemented |
LE0550 # 02 Y:2023 | 02 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,474 | $2,500 | Implemented |
LE0550 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,663 | $100 | Implemented |
LE0550 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,791 | $34,566 | Implemented |