Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

212

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0258 # 02 Y:2007 02 2007 USE RADIANT HEATER FOR SPOT HEATING $12,411 $18,750 Not Implemented
LE0258 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,871 $10,000 Not Implemented
LE0258 # 04 Y:2007 04 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,874 $5,000 Not Implemented
LE0258 # 05 Y:2007 05 2007 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $767 $150 Not Implemented
LE0258 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,367 $40,684 Not Implemented
LE0258 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $387 $1,400 Not Implemented
LE0257 # 01 Y:2007 01 2007 USE OPTIMUM TEMPERATURE $14,693 $3,500 Implemented
LE0257 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,241 $10,000 Not Implemented
LE0257 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,861 $6,000 Not Implemented
LE0257 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,031 $0 Implemented
LE0257 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $661 $800 Not Implemented
LE0257 # 06 Y:2007 06 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $641 $2,000 Not Implemented
LE0257 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,008 $5,752 Not Implemented
LE0257 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $1,047 $150 Implemented
DL0003 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,542 $92,679 Not Implemented
DL0003 # 10 Y:2007 10 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $1,470 $40,500 Not Implemented
DL0003 # 03 Y:2007 03 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,891 $2,000 Not Implemented
DL0003 # 04 Y:2007 04 2007 USE MINIMUM STEAM OPERATING PRESSURE $1,497 $0 Implemented
DL0003 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,500 $10,000 Not Implemented
DL0003 # 06 Y:2007 06 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $51,975 $25,000 Not Implemented
DL0003 # 08 Y:2007 08 2007 REPLACE BOILER $4,572 $15,400 Not Implemented
DL0003 # 01 Y:2007 01 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,287 $45,000 Not Implemented
DL0003 # 07 Y:2007 07 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $23,137 $20,000 Implemented
DL0003 # 09 Y:2007 09 2007 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,892 $0 Implemented
LE0254 # 02 Y:2007 02 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $67,570 $67,000 Not Implemented