IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

244

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0301 # 04 Y:2010 04 2010 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $28,496 $10,000 Not Implemented
LE0301 # 05 Y:2010 05 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $24,299 $75,000 Not Implemented
LE0301 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $23,321 $4,200 Implemented
LE0301 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,721 $22,000 Not Implemented
LE0301 # 08 Y:2010 08 2010 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,375 $100,000 Not Implemented
LE0301 # 09 Y:2010 09 2010 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,386 $8,000 Not Implemented
LE0301 # 10 Y:2010 10 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,358 $870 Implemented
LE0301 # 11 Y:2010 11 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,938 $3,000 Not Implemented
LE0301 # 12 Y:2010 12 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,001 $4,500 Implemented
LE0301 # 13 Y:2010 13 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $2,440 Implemented
LE0301 # 14 Y:2010 14 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,029 $20,000 Implemented
LE0301 # 15 Y:2010 15 2010 INSTALL OCCUPANCY SENSORS $1,097 $2,035 Implemented
LE0301 # 16 Y:2010 16 2010 INSTALL TIMERS AND/OR THERMOSTATS $153 $1,000 Implemented
DL0055 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $31,870 $13,000 Not Implemented
DL0055 # 02 Y:2010 02 2010 REPLACE BOILER $59,500 $102,000 Not Implemented
DL0055 # 03 Y:2010 03 2010 OPERATE BOILERS ON HIGH FIRE SETTING $35,000 $50 Not Implemented
DL0055 # 04 Y:2010 04 2010 REPLACE TREATED WATER WITH WELL / SURFACE WATER $39,150 $100,000 Not Implemented
DL0055 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $82,808 $125,000 Implemented
DL0055 # 06 Y:2010 06 2010 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $9,000 $3,000 Implemented
DL0055 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,600 $1,200 Implemented
DL0055 # 08 Y:2010 08 2010 REDUCE VENTILATION AIR $21,000 $15,000 Not Implemented
DL0055 # 09 Y:2010 09 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $23,200 $15,000 Not Implemented
DL0055 # 10 Y:2010 10 2010 KEEP EQUIPMENT CLEAN $3,631 $500 Implemented
DL0055 # 11 Y:2010 11 2010 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $3,631 $1,830 Implemented
DL0055 # 12 Y:2010 12 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,467 $6,000 Implemented