IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0593 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $1,845 $3,682 Implemented
WV0593 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,139 $1,114 Implemented
WV0593 # 10 Y:2020 10 2020 ADJUST BURNERS FOR EFFICIENT OPERATION $1,826 $3,500 Not Implemented
WV0593 # 11 Y:2020 11 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,741 $1,284 Implemented
WV0593 # 08 Y:2020 08 2020 DEVELOP A REPAIR/REPLACE POLICY $1,877 $318 Implemented
WV0593 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,054 $69,828 Implemented
LE0495 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,360 $1,375 Not Implemented
LE0495 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $122 $360 Not Implemented
LE0495 # 02 Y:2020 02 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,183 $360 Not Implemented
LE0495 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,226 $270 Not Implemented
LE0495 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,065 $40 Not Implemented
LE0495 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,587 $20,636 Not Implemented
LE0494 # 05 Y:2020 05 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $22,684 $35,000 Not Implemented
LE0494 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,651 $13,000 Not Implemented
LE0494 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $3,038 $1,620 Implemented
LE0494 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,225 $8,000 Not Implemented
LE0494 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,702 $43,257 Not Implemented
LE0494 # 06 Y:2020 06 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,199 $10,000 Not Implemented
LE0494 # 08 Y:2020 08 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,873 $27,900 Not Implemented
LE0494 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,586 $11,000 Not Implemented
WV0592 # 14 Y:2020 14 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $47 $250 Not Implemented
WV0592 # 13 Y:2020 13 2020 INSULATE BARE EQUIPMENT $157 $742 Implemented
WV0592 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,217 $9,054 Implemented
WV0592 # 05 Y:2020 05 2020 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,832 $4,720 Not Implemented
WV0592 # 04 Y:2020 04 2020 MINIMIZE WATER USAGE $3,145 $2,100 Implemented