IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0345 # 08 Y:2018 08 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $785 $1,560 Not Implemented
MI0345 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $810 $2,138 Not Implemented
MI0345 # 06 Y:2018 06 2018 USE SOLAR HEAT TO HEAT WATER $1,166 $2,755 Implemented
MI0345 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,380 $540 Implemented
MI0345 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,410 $1,982 Not Implemented
MI0345 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $3,443 Implemented
MI0345 # 02 Y:2018 02 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,837 $3,204 Implemented
MI0345 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $7,969 $3,100 Implemented
MI0344 # 06 Y:2018 06 2018 USE PHOTOCELL CONTROLS $3,042 $2,219 Implemented
MI0344 # 01 Y:2018 01 2018 REPLACE TREATED WATER WITH WELL / SURFACE WATER $55,478 $62,800 Not Implemented
MI0344 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $12,638 $18,415 Not Implemented
MI0344 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,405 $6,666 Implemented
MI0344 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,313 $15,147 Implemented
MI0344 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $7,317 $9,570 Not Implemented
MI0344 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,495 $2,030 Implemented
MI0344 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $1,536 $846 Implemented
MI0344 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $474 $760 Implemented
MI0342 # 07 Y:2018 07 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $770 $80 Implemented
MI0342 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $56,921 $3,280 Implemented
MI0342 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $48,793 $800 Implemented
MI0342 # 03 Y:2018 03 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $32,500 $15,000 Implemented
MI0342 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $4,165 Implemented
MI0342 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,291 $14,298 Implemented
MI0342 # 06 Y:2018 06 2018 OPTIMIZE PLANT POWER FACTOR $3,475 $14,430 Not Implemented
MI0341 # 02 Y:2018 02 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $75,087 $115,295 Not Implemented