Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0413 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $572 | $1,000 | n/a |
MA0413 # 03 Y:1998 | 03 | 1998 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $2,015 | $2,000 | n/a |
MA0413 # 02 Y:1998 | 02 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,782 | $800 | n/a |
MA0413 # 01 Y:1998 | 01 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,342 | $53,316 | n/a |
MA0409 # 05 Y:1998 | 05 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $-1,436 | $815 | Implemented |
MA0409 # 04 Y:1998 | 04 | 1998 | PAY BILLS ON TIME TO AVOID LATE FEES | $392 | $0 | Implemented |
MA0409 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $157 | $181 | Not Implemented |
MA0409 # 02 Y:1998 | 02 | 1998 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $351 | $215 | Not Implemented |
MA0409 # 01 Y:1998 | 01 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,000 | $650 | Implemented |
MA0406 # 02 Y:1998 | 02 | 1998 | UPGRADE CONTROLS ON COMPRESSORS | $3,950 | $1,785 | Not Implemented |
MA0406 # 08 Y:1998 | 08 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,070 | $13,540 | Not Implemented |
MA0406 # 07 Y:1998 | 07 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,468 | $24,000 | Implemented |
MA0406 # 06 Y:1998 | 06 | 1998 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $3,045 | $14,790 | Not Implemented |
MA0406 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,955 | $2,332 | Not Implemented |
MA0406 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $802 | $541 | Implemented |
MA0406 # 03 Y:1998 | 03 | 1998 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,323 | $187 | Implemented |
MA0406 # 01 Y:1998 | 01 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $3,022 | $200 | Implemented |
MA0408 # 03 Y:1998 | 03 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,188 | $1,000 | Implemented |
MA0408 # 04 Y:1998 | 04 | 1998 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $2,939 | $5,520 | Not Implemented |
MA0408 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,735 | $100 | Implemented |
MA0408 # 06 Y:1998 | 06 | 1998 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,487 | $2,675 | Not Implemented |
MA0408 # 07 Y:1998 | 07 | 1998 | INSULATE BARE EQUIPMENT | $644 | $513 | Implemented |
MA0408 # 08 Y:1998 | 08 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $27,232 | $250,000 | Implemented |
MA0408 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,625 | $8,625 | Not Implemented |
MA0408 # 01 Y:1998 | 01 | 1998 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $99,832 | $87,100 | Not Implemented |