IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

275

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0567 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,060 $37,200 Implemented
GT0567 # 08 Y:1995 08 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $1,650 $0 Implemented
GT0567 # 09 Y:1995 09 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $186,200 $100,000 Implemented
NC0053 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,554 $476 Not Implemented
NC0053 # 02 Y:1995 02 1995 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $161 $150 Implemented
NC0053 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $833 $2,100 Not Implemented
NC0053 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $495 $150 Implemented
NC0053 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,991 $3,790 Implemented
NC0053 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $1,717 $248 Implemented
NC0051 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,276 $570 Not Implemented
NC0051 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,978 $420 Implemented
NC0051 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,450 $12,000 Not Implemented
NC0051 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,438 $4,430 Implemented
NC0051 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,206 $1,960 Not Implemented
NC0051 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,236 $3,200 Not Implemented
NC0051 # 07 Y:1995 07 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,190 $0 Implemented
NC0051 # 08 Y:1995 08 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $24,714 $18,000 Not Implemented
NC0051 # 09 Y:1995 09 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,325 $3,800 Not Implemented
GT0501 # 01 Y:1993 01 1993 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,620 $10,000 Implemented
GT0501 # 02 Y:1993 02 1993 REDUCE EXCESSIVE BOILER BLOWDOWN $1,760 $0 Not Implemented
GT0501 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,930 $115,900 Implemented
GT0501 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $54,440 $20,000 Not Implemented
GT0501 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $21,500 $3,500 Implemented
GT0501 # 06 Y:1993 06 1993 UPGRADE CONTROLS ON COMPRESSORS $21,170 $30,000 Implemented
GT0501 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,710 $65,530 Implemented