Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0417 # 09 Y:2010 | 09 | 2010 | USE PHOTOCELL CONTROLS | $417 | $122 | Not Implemented |
NC0417 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $2,865 | $2,751 | Not Implemented |
NC0417 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $168 | $199 | Not Implemented |
NC0417 # 06 Y:2010 | 06 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $2,928 | $1,000 | Not Implemented |
NC0417 # 05 Y:2010 | 05 | 2010 | ADOPT IN-HOUSE MATERIAL GENERATION | $26,671 | $70,000 | Not Implemented |
NC0417 # 04 Y:2010 | 04 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $739 | $180 | Not Implemented |
NC0417 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,220 | $2,500 | Not Implemented |
NC0417 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,199 | $100 | Implemented |
NC0417 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $101,691 | $362,675 | Not Implemented |
NC0406 # 11 Y:2010 | 11 | 2010 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $20,625 | $50,000 | Implemented |
NC0406 # 01 Y:2010 | 01 | 2010 | ADOPT IN-HOUSE MATERIAL GENERATION | $77,083 | $85,000 | Not Implemented |
NC0406 # 10 Y:2010 | 10 | 2010 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $276,388 | $214,700 | Implemented |
NC0406 # 09 Y:2010 | 09 | 2010 | INSTALL OCCUPANCY SENSORS | $1,958 | $3,256 | Implemented |
NC0406 # 08 Y:2010 | 08 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $508 | $920 | Implemented |
NC0406 # 07 Y:2010 | 07 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,747 | $8,000 | Not Implemented |
NC0406 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,210 | $15,045 | Not Implemented |
NC0406 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,835 | $100 | Implemented |
NC0406 # 04 Y:2010 | 04 | 2010 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,743 | $50,000 | Implemented |
NC0406 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,177 | $50 | Implemented |
NC0406 # 02 Y:2010 | 02 | 2010 | TREAT AND REUSE RINSE WATERS | $51,487 | $8,875 | Not Implemented |