Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0103 # 02 Y:2012 | 02 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,152 | $35,480 | Not Implemented |
TT0103 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,318 | $5,300 | Implemented |
TT0103 # 04 Y:2012 | 04 | 2012 | STANDARDIZE MOTOR INVENTORY | $0 | $0 | Not Implemented |
TT0103 # 05 Y:2012 | 05 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $35,332 | $1,960 | Not Implemented |
TT0103 # 01 Y:2012 | 01 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,502 | $0 | Implemented |
MZ0093 # 06 Y:2012 | 06 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,502 | $0 | Implemented |
MZ0093 # 05 Y:2012 | 05 | 2012 | OPTIMIZE PLANT POWER FACTOR | $21,600 | $15,000 | Not Implemented |
MZ0093 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,388 | $1,120 | Implemented |
MZ0093 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $1,224 | $700 | Implemented |
MZ0093 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,852 | $2,800 | Implemented |
MZ0093 # 01 Y:2012 | 01 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,525 | $1,520 | Not Implemented |
TT0091 # 04 Y:2012 | 04 | 2012 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $3,203 | $0 | Implemented |
TT0091 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $688 | $350 | Implemented |
TT0091 # 02 Y:2012 | 02 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $170 | $20 | Not Implemented |
TT0091 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,974 | $3,000 | Implemented |
TT0088 # 03 Y:2012 | 03 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,506 | $5,300 | Not Implemented |
TT0088 # 04 Y:2012 | 04 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $800 | $850 | Not Implemented |
TT0088 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,989 | $10,200 | Not Implemented |
TT0088 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $11,880 | Not Implemented |
TT0088 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,346 | $3,350 | Not Implemented |
TT0088 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $77 | $1,014 | Not Implemented |
TT0088 # 09 Y:2012 | 09 | 2012 | METER WASTE WATER | $3,603 | $750 | Not Implemented |
TT0088 # 10 Y:2012 | 10 | 2012 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $19,167 | $47,935 | Not Implemented |
TT0088 # 02 Y:2012 | 02 | 2012 | OPTIMIZE PLANT POWER FACTOR | $1,465 | $3,978 | Not Implemented |
TT0088 # 01 Y:2012 | 01 | 2012 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $192 | $25 | Not Implemented |