IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

287

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0209 # 11 Y:2018 11 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $465 Implemented
TT0205 # 08 Y:2018 08 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $5,176 $6,900 Not Implemented
TT0205 # 07 Y:2018 07 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,761 $8,362 Not Implemented
TT0205 # 06 Y:2018 06 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $9,911 $10,800 Not Implemented
TT0205 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,941 $160 Not Implemented
TT0205 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $28,188 $132,000 Not Implemented
TT0205 # 03 Y:2018 03 2018 METER WASTE WATER $30,463 $1,000 Not Implemented
TT0205 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $376,439 $1,600 Not Implemented
TT0205 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $376,439 $20 Implemented
TT0206 # 03 Y:2018 03 2018 INSTALL TIMERS AND/OR THERMOSTATS $428 $150 Not Implemented
TT0206 # 02 Y:2018 02 2018 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $6,182 $25 Not Implemented
TT0206 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,406 $32,616 Not Implemented
TT0196 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,539 $1,150 Not Implemented
TT0196 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $36,417 $148,815 Not Implemented
TT0196 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,605 $3,050 Implemented
TT0196 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,985 $31 Not Implemented
TT0196 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $5,438 $19,250 Not Implemented
TT0175 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,500 $6,820 Not Implemented
TT0175 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $40,909 $94,503 Not Implemented
TT0175 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $12,631 $125 Implemented
TT0175 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,213 $25 Implemented
TT0175 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,579 $23,120 Not Implemented
TT0175 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,832 $2,400 Not Implemented
TT0175 # 06 Y:2016 06 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,374 $400 Implemented
TT0175 # 09 Y:2016 09 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,155 $200 Implemented