IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0162 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,231 $11,000 Not Implemented
TT0162 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,792 $1,075 Not Implemented
TT0162 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $7,531 $16,988 Not Implemented
TT0162 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,958 $3,000 Implemented
TT0162 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,012 $2,000 Not Implemented
TT0162 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $19,039 $10,000 Implemented
TT0162 # 04 Y:2015 04 2015 INSTALL SPECTRAL REFLECTORS / DELAMP $5,229 $706 Not Implemented
TT0161 # 04 Y:2015 04 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $19,704 $2,000 Not Implemented
TT0161 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $12,012 $2,000 Not Implemented
TT0161 # 07 Y:2015 07 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,860 $12,000 Not Implemented
TT0161 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $17,886 $6,135 Not Implemented
TT0161 # 03 Y:2015 03 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,126 $10,000 Not Implemented
TT0161 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,583 $1,140 Not Implemented
TT0161 # 11 Y:2015 11 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,222 $2,000 Not Implemented
TT0161 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,785 $300 Not Implemented
TT0161 # 10 Y:2015 10 2015 ISOLATE HOT OR COLD EQUIPMENT $1,634 $600 Not Implemented
TT0161 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $90,145 $45,000 Not Implemented
TT0161 # 02 Y:2015 02 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $26,125 $2,000 Not Implemented
TT0161 # 12 Y:2015 12 2015 INSTALL SPECTRAL REFLECTORS / DELAMP $202 $20 Not Implemented
TT0159 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,756 $7,500 Not Implemented
TT0159 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $2,995 $1,070 Implemented
TT0159 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,329 $63 Not Implemented
TT0159 # 09 Y:2015 09 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,816 $1,000 Not Implemented
TT0159 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,175 $38,170 Not Implemented
TT0159 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,644 $3,000 Implemented