IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

125

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0216 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $1,254 $1,710 Implemented
TT0216 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,220 $20 Implemented
TT0216 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,054 $3,559 Implemented
TT0216 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $386 $1,530 Implemented
TT0217 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,999 $37,500 Not Implemented
TT0217 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,903 $25,280 Implemented
TT0217 # 03 Y:2019 03 2019 RECOVER AND REUSE COOLING WATER $17,311 $400 Implemented
TT0217 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $3,136 $1,541 Implemented
TT0218 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,090 $85,313 Implemented
TT0218 # 02 Y:2019 02 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,004 $2,150 Implemented
TT0218 # 03 Y:2019 03 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,902 $30,000 Not Implemented
TT0218 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $20,301 $8,000 Not Implemented
TT0218 # 05 Y:2019 05 2019 INCREASE AMOUNT OF CONDENSATE RETURNED $5,090 $15,000 Implemented
TT0218 # 06 Y:2019 06 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,670 $200 Implemented
TT0218 # 07 Y:2019 07 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,000 $2,000 Implemented
TT0218 # 08 Y:2019 08 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,058 $4,500 Not Implemented
TT0218 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $1,202 $2,400 Implemented
TT0218 # 10 Y:2019 10 2019 ELIMINATE/REDUCE AN OPERATION $798 $340 Implemented
TT0214 # 01 Y:2019 01 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $223,429 $3,000 Implemented
TT0214 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,974 $152,490 Not Implemented
TT0214 # 03 Y:2019 03 2019 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $24,664 $106,000 Not Implemented
TT0214 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,330 $66,000 Not Implemented
TT0214 # 05 Y:2019 05 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $23,715 $75,000 Not Implemented
TT0214 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $13,401 $5,000 Implemented
TT0214 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,443 $15,674 Not Implemented