IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0036 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,972 $5,609 n/a
NT0036 # 01 Y:2025 01 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $688 $0 n/a
NT0036 # 03 Y:2025 03 2025 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,825 $0 n/a
NT0036 # 04 Y:2025 04 2025 OPTIMIZE PLANT POWER FACTOR $6,170 $16,268 n/a
NT0034 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,552 $19,950 n/a
NT0034 # 05 Y:2024 05 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,461 $1,258 n/a
NT0034 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,040 $1,056 n/a
NT0034 # 02 Y:2024 02 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $249 $0 n/a
NT0034 # 06 Y:2024 06 2024 APPLY FOR INVESTMENT INCENTIVES $3,553 $5,000 n/a
NT0034 # 07 Y:2024 07 2024 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $30,115 $80,000 n/a
NT0034 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $131 $414 n/a
TR0059 # 01 Y:2024 01 2024 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $36,781 $32,522 n/a
TR0059 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $148,771 $739,065 n/a
TR0059 # 04 Y:2024 04 2024 METER WASTE WATER $5,966 $1,570 n/a
TR0059 # 03 Y:2024 03 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,395 $4,000 n/a
NT0032 # 03 Y:2024 03 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,332 $0 n/a
NT0032 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,030 $0 n/a
NT0032 # 04 Y:2024 04 2024 APPLY FOR INVESTMENT INCENTIVES $1,001 $2,500 n/a
NT0032 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,842 $5,609 n/a
NT0032 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $2,831 $2,669 n/a
AM0931 # 06 Y:2024 06 2024 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $147 $4,226 n/a
AM0931 # 04 Y:2024 04 2024 MAINTAIN MACHINES TO REDUCE LEAKS $197 $65 n/a
AM0931 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $18,321 $499,200 n/a
AM0931 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $2,803 $8,670 n/a
AM0931 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,952 $48,006 n/a