IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0840 # 08 Y:2013 08 2013 REPLACE BOILER $6,063 $60,000 Not Implemented
OK0840 # 09 Y:2013 09 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,770 $21,632 Not Implemented
OK0840 # 10 Y:2013 10 2013 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,310 $4,958 Implemented
OK0840 # 11 Y:2013 11 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,220 $3,650 Not Implemented
OK0840 # 12 Y:2013 12 2013 INSTALL SET-BACK TIMERS $2,987 $2,259 Implemented
OK0840 # 13 Y:2013 13 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,448 $0 Implemented
OK0840 # 14 Y:2013 14 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,826 $25,000 Implemented
OK0835 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,445 $1,500 Implemented
OK0835 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,644 $17,103 Not Implemented
OK0835 # 03 Y:2012 03 2012 REPLACE BOILER $10,532 $96,000 Not Implemented
OK0835 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $538 $3,183 Implemented
OK0835 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $5,126 Not Implemented
OK0835 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $18,902 $19,520 Not Implemented
OK0835 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,139 $33,990 Not Implemented
OK0835 # 08 Y:2012 08 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,097 $24,155 Not Implemented
OK0835 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,068 $1,288 Not Implemented
OK0835 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,937 $1,000 Implemented
OK0835 # 11 Y:2012 11 2012 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $621 $120 Implemented
OK0835 # 12 Y:2012 12 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $31,425 $0 Implemented
OK0835 # 13 Y:2012 13 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,840 $4,000 Not Implemented
OK0835 # 14 Y:2012 14 2012 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $987 $240 Not Implemented
AM0527 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $33,106 $56,785 Implemented
AM0527 # 02 Y:2007 02 2007 $28,915 $0 Implemented
AM0527 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $19,815 $27,489 Implemented
AM0527 # 04 Y:2007 04 2007 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,604 $0 Not Implemented