IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

198

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0768 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $3,900 Not Implemented
AM0768 # 03 Y:2019 03 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,910 $0 Implemented
AM0768 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,730 $1,000 Implemented
AM0768 # 01 Y:2019 01 2019 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,120 $0 Implemented
AM0768 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $615 Not Implemented
AM0768 # 07 Y:2019 07 2019 USE PHOTOCELL CONTROLS $390 $500 Implemented
AM0768 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $360 $133 Implemented
AM0763 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,600 $37,900 Implemented
AM0763 # 07 Y:2018 07 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $38,500 $400 Not Implemented
AM0763 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,730 $42,230 Implemented
AM0763 # 05 Y:2018 05 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $45,525 $8,000 Not Implemented
AM0763 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98,130 $20,000 Implemented
AM0763 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $105,400 $136,400 Implemented
AM0763 # 02 Y:2018 02 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $515,700 $2,200,000 Not Implemented
AM0763 # 01 Y:2018 01 2018 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $327,000 $0 Not Implemented
AM0763 # 09 Y:2018 09 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,640 $7,720 Implemented
AM0731 # 07 Y:2017 07 2017 USE SYNTHETIC LUBRICANT $400 $0 Not Implemented
AM0731 # 06 Y:2017 06 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $770 $1,360 Not Implemented
AM0731 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,140 $310 Not Implemented
AM0731 # 04 Y:2017 04 2017 REPAIR OR REPLACE STEAM TRAPS $1,470 $180 Not Implemented
AM0731 # 03 Y:2017 03 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,790 $660 Not Implemented
AM0731 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,440 $10,010 Not Implemented
AM0731 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,980 $5,000 Not Implemented
AM0707 # 07 Y:2016 07 2016 USE SYNTHETIC LUBRICANT $103 $0 Not Implemented
AM0707 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,170 $2,000 Implemented