IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0887 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,300 $0 Not Implemented
AM0887 # 03 Y:2023 03 2023 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $3,790 $8,650 Not Implemented
AM0887 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,360 $303 Implemented
AM0887 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,340 $850 Implemented
AM0887 # 06 Y:2023 06 2023 USE SYNTHETIC LUBRICANT $860 $440 Not Implemented
AM0887 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $912 $1,783 Implemented
AM0887 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,830 $1,000 Implemented
NT0010 # 05 Y:2023 05 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,400 $1,600 Not Implemented
NT0010 # 04 Y:2023 04 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $37,440 $111,000 Not Implemented
NT0010 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $4,823 $5,241 Not Implemented
NT0010 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,261 $0 Not Implemented
NT0010 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,307 $5,753 Not Implemented
NT0010 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,423 $0 Not Implemented
NT0004 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $27,237 $63,579 Not Implemented
NT0004 # 03 Y:2023 03 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $29,874 $0 Not Implemented
NT0004 # 02 Y:2023 02 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $38,000 $38,000 Not Implemented
NT0004 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,449 $0 Not Implemented
NT0004 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $735 $0 Not Implemented
NT0004 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,687 $5,993 Not Implemented
NT0004 # 07 Y:2023 07 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $18,694 $0 Not Implemented
NT0002 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,880 $7,474 Implemented
NT0002 # 06 Y:2023 06 2023 AUTOMATE FINISHING PROCESS $96,307 $111,000 Not Implemented
NT0002 # 05 Y:2023 05 2023 ELIMINATE/REDUCE AN OPERATION $9,631 $0 Implemented
NT0002 # 04 Y:2023 04 2023 INSTALL SET-BACK TIMERS $1,504 $0 Implemented
NT0002 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $14,389 $21,853 Not Implemented