IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0038 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $287 $375 Implemented
KG0020 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,366 $2,702 Implemented
KG0020 # 02 Y:1995 02 1995 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $8,855 $450 Implemented
KG0020 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $3,232 $455 Implemented
KG0020 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,877 $4,500 Implemented
KG0020 # 05 Y:1995 05 1995 INSTALL TIMERS AND/OR THERMOSTATS $653 $900 Implemented
KG0020 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $1,050 Implemented
AM0234 # 01 Y:1995 01 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,300 $1,000 Implemented
AM0234 # 02 Y:1995 02 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,560 $0 Implemented
AM0234 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,200 $300 Implemented
AM0223 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $350 $500 Implemented
AM0223 # 06 Y:1994 06 1994 REUSE / RECYCLE/ SELL PAPER PRODUCTS $8,800 $0 Implemented
KG0011 # 02 Y:1994 02 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,517 $10,000 Implemented
KG0011 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,069 $607 Implemented
KG0011 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $310 $420 Implemented
AM0219 # 01 Y:1994 01 1994 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $22,956 $145,710 Implemented
AM0219 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $960 $2,405 Implemented
AM0219 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,510 $1,413 Implemented
AM0210 # 01 Y:1994 01 1994 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,430 $680 Implemented
AM0210 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,107 $910 Implemented
AM0210 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $890 $150 Implemented
AM0210 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $880 $500 Implemented
AM0210 # 06 Y:1994 06 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $220 $0 Implemented
AM0078 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,600 $0 Implemented
AM0078 # 03 Y:1990 03 1990 ISOLATE HOT OR COLD EQUIPMENT $1,090 $500 Implemented