IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0186 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $3,932 $15,000 Not Implemented
UU0186 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,796 $4,794 Not Implemented
UU0186 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $822 $1,645 Implemented
UU0186 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $544 $200 Implemented
UU0186 # 06 Y:2021 06 2021 ADD AREA LIGHTING SWITCHES $398 $883 Implemented
UU0186 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,919 $19,705 Implemented
UU0178 # 06 Y:2021 06 2021 Hire Energy Manager $25,000 $7,800 Not Implemented
UU0178 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,197 $9,700 Not Implemented
UU0178 # 04 Y:2021 04 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $99,244 $320,000 Not Implemented
UU0178 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $4,347 $9,400 Not Implemented
UU0178 # 02 Y:2021 02 2021 INSULATE BARE EQUIPMENT $8,654 $3,913 Not Implemented
UU0178 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,811 $1,300 Not Implemented
UU0176 # 07 Y:2021 07 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,411 $5,700 Implemented
UU0176 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,012 $22,700 Not Implemented
UU0176 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,766 $7,600 Implemented
UU0176 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $23,470 $21,270 Not Implemented
UU0176 # 03 Y:2021 03 2021 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $29,753 $10,400 Implemented
UU0176 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $94,747 $42,608 Implemented
UU0176 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $156,566 $187,200 Not Implemented