Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
132
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0078 # 05 Y:2004 | 05 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,620 | $12,000 | Not Implemented |
UU0078 # 07 Y:2004 | 07 | 2004 | OPTIMIZE PLANT POWER FACTOR | $10,400 | $11,590 | Not Implemented |
UU0078 # 06 Y:2004 | 06 | 2004 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $5,720 | $1,120 | Not Implemented |
UU0078 # 08 Y:2004 | 08 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $810 | $450 | Implemented |
UU0078 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,970 | $400 | Implemented |
UU0078 # 01 Y:2004 | 01 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,850 | $10,000 | Not Implemented |
UU0078 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,465 | $405 | Implemented |
UU0078 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,890 | $4,820 | Implemented |
UU0077 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,520 | $5,000 | Implemented |
UU0077 # 04 Y:2004 | 04 | 2004 | ADJUST PH FOR NEUTRALIZATION | $12,850 | $45,920 | Not Implemented |
UU0077 # 03 Y:2004 | 03 | 2004 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $14,890 | $45,000 | Implemented |
UU0077 # 01 Y:2004 | 01 | 2004 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $12,125 | $2,670 | Not Implemented |
UU0076 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,300 | $4,824 | Not Implemented |
UU0076 # 02 Y:2004 | 02 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24 | $40 | Not Implemented |
UU0076 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,600 | $2,000 | Not Implemented |
UU0076 # 06 Y:2004 | 06 | 2004 | OPTIMIZE PLANT POWER FACTOR | $1,982 | $2,220 | Not Implemented |
UU0076 # 03 Y:2004 | 03 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $30 | $0 | Not Implemented |
UU0076 # 05 Y:2004 | 05 | 2004 | METER WASTE WATER | $5,360 | $1,500 | Not Implemented |
UU0075 # 01 Y:2004 | 01 | 2004 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $400 | $250 | Not Implemented |
UU0075 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,120 | $150 | Implemented |
UU0075 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,590 | $1,320 | Implemented |
UU0075 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,700 | $8,000 | Not Implemented |
UU0075 # 06 Y:2004 | 06 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,540 | $8,000 | Not Implemented |
UU0075 # 07 Y:2004 | 07 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $980 | $4,500 | Not Implemented |
UU0075 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,270 | $1,000 | Implemented |