IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0027 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $890 $500 Implemented
OD0027 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,253 $14,228 Implemented
OD0028 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,219 $15,873 Implemented
OD0028 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,628 $1,500 Implemented
OD0013 # 02 Y:1994 02 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,441 $3,000 Implemented
OD0013 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,776 $8,261 Implemented
OD0013 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,197 $3,440 Implemented
OD0013 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,076 $140 Implemented
WV0044 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68 $687 Implemented
WV0044 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,195 $1,032 Implemented
WV0044 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $3,038 $0 Implemented
WV0043 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $123 $687 Implemented
WV0043 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $787 $500 Implemented
WV0043 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,644 $100 Implemented
OD0004 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,341 $800 Implemented
OD0004 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,431 $11,417 Implemented
TN0371 # 01 Y:1989 01 1989 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $24,816 $13,460 Implemented
TN0371 # 02 Y:1989 02 1989 REPAIR AND ELIMINATE STEAM LEAKS $5,334 $600 Implemented
TN0371 # 03 Y:1989 03 1989 USE MINIMUM STEAM OPERATING PRESSURE $2,783 $0 Implemented
TN0371 # 04 Y:1989 04 1989 REDUCE VENTILATION AIR $10,059 $3,100 Implemented
TN0371 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,475 $3,050 Implemented
TN0371 # 06 Y:1989 06 1989 INSULATE BARE EQUIPMENT $7,555 $536 Implemented
TN0371 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,305 $660 Implemented
TN0371 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,659 $0 Implemented
AT0107 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $43,172 $0 Implemented