Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
271
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0654 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,126 | $3,800 | n/a |
WV0654 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $3,551 | $9,700 | n/a |
WV0654 # 03 Y:2023 | 03 | 2023 | REDUCE VENTILATION AIR | $5,594 | $13,814 | n/a |
WV0654 # 04 Y:2023 | 04 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,126 | $9,645 | n/a |
WV0654 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,942 | $63,000 | n/a |
WV0654 # 09 Y:2023 | 09 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $951 | $330 | n/a |
WV0654 # 07 Y:2023 | 07 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,242 | $6,000 | n/a |
WV0654 # 06 Y:2023 | 06 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,462 | $5,940 | n/a |
WV0654 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,093 | $1,113 | n/a |
WV0654 # 14 Y:2023 | 14 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $282 | $1,370 | n/a |
WV0654 # 15 Y:2023 | 15 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $226 | $970 | n/a |
WV0654 # 12 Y:2023 | 12 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $554 | $150 | n/a |
WV0654 # 11 Y:2023 | 11 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $612 | $1,300 | n/a |
WV0654 # 17 Y:2023 | 17 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $176 | $240 | n/a |
WV0654 # 16 Y:2023 | 16 | 2023 | INSULATE BARE EQUIPMENT | $190 | $98 | n/a |
WV0654 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $648 | $3,230 | n/a |
WV0654 # 13 Y:2023 | 13 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $493 | $1,500 | n/a |
WV0641 # 03 Y:2023 | 03 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $123,784 | $178,886 | Not Implemented |
WV0641 # 01 Y:2023 | 01 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $235,798 | $32,000 | Not Implemented |
WV0641 # 07 Y:2023 | 07 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,857 | $5,425 | Implemented |
WV0641 # 02 Y:2023 | 02 | 2023 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $189,197 | $575,150 | Not Implemented |
WV0641 # 05 Y:2023 | 05 | 2023 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $32,260 | $112,625 | Not Implemented |
WV0641 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $917 | $933 | Implemented |
WV0641 # 09 Y:2023 | 09 | 2023 | INSULATE BARE EQUIPMENT | $402 | $758 | Implemented |
WV0641 # 06 Y:2023 | 06 | 2023 | REDUCE VENTILATION AIR | $16,843 | $4,400 | Implemented |