Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0567 # 04 Y:2004 | 04 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $8,762 | $1,000 | Implemented |
MA0567 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,220 | $11,950 | Not Implemented |
MA0567 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,942 | $5,000 | Not Implemented |
MA0567 # 01 Y:2004 | 01 | 2004 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $70,900 | $270,000 | Implemented |
MA0567 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,633 | $54,474 | Not Implemented |
MA0567 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $4,156 | $6,867 | Implemented |
MA0567 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $1,615 | $1,369 | Implemented |
MA0535 # 12 Y:2003 | 12 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,038 | $0 | Implemented |
MA0535 # 04 Y:2003 | 04 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $56,908 | $84,343 | n/a |
MA0535 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,836 | $11,700 | n/a |
MA0535 # 05 Y:2003 | 05 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,274 | $6,000 | Not Implemented |
MA0535 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,511 | $5,800 | Not Implemented |
MA0535 # 10 Y:2003 | 10 | 2003 | OPTIMIZE PLANT POWER FACTOR | $1,303 | $0 | Implemented |
MA0535 # 13 Y:2003 | 13 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $617 | $0 | Implemented |
MA0535 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $1,685 | $864 | Not Implemented |
MA0535 # 08 Y:2003 | 08 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,521 | $9,300 | Not Implemented |
MA0535 # 02 Y:2003 | 02 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $67,147 | $59,125 | n/a |
MA0535 # 01 Y:2003 | 01 | 2003 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $372,126 | $3,870,145 | n/a |
MA0535 # 03 Y:2003 | 03 | 2003 | REDUCE VENTILATION AIR | $62,192 | $0 | Not Implemented |
MA0535 # 11 Y:2003 | 11 | 2003 | USE PHOTOCELL CONTROLS | $1,058 | $1,058 | Not Implemented |
MA0520 # 06 Y:2002 | 06 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $106 | $0 | Not Implemented |
MA0520 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,609 | $0 | Not Implemented |
MA0520 # 03 Y:2002 | 03 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,389 | $500 | Implemented |
MA0520 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $627 | $4,496 | Not Implemented |
MA0520 # 05 Y:2002 | 05 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $796 | $800 | Not Implemented |