IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0615 # 03 Y:2013 03 2013 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $791,616 $300,000 Not Implemented
OR0615 # 02 Y:2013 02 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $48,896 $68,866 Implemented
OR0615 # 01 Y:2013 01 2013 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING $24,283 $1,000 Implemented
UW0048 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,203 $2,440 Not Implemented
UW0048 # 01 Y:2011 01 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $308,364 $40,543 Not Implemented
UW0046 # 01 Y:2011 01 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $44,504 $330 Not Implemented
UW0046 # 02 Y:2011 02 2011 REPLACE BOILER $38,030 $90,000 Not Implemented
UW0046 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,735 $1,160 Not Implemented
UW0040 # 02 Y:2010 02 2010 KEEP BOILER TUBES CLEAN $82,215 $50,000 Implemented
UW0040 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,477 $32,020 Not Implemented
UW0040 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $977,184 $420,000 Implemented
UW0030 # 02 Y:2009 02 2009 KEEP BOILER TUBES CLEAN $115,460 $50,000 Not Implemented
UW0030 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $74,218 $166,366 Not Implemented
UW0030 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $134,729 $705,718 Not Implemented
UW0027 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,632 $10,324 Not Implemented
UW0027 # 02 Y:2009 02 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,650 $37,000 Not Implemented
UW0027 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $5,716 $871 Not Implemented
UW0027 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,168 $2,280 Implemented
UW0027 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
UW0006 # 08 Y:2007 08 2007 DEVELOP A REPAIR/REPLACE POLICY $1,318 $597 Implemented
UW0006 # 07 Y:2007 07 2007 USE SOLAR HEAT TO HEAT WATER $1,600 $4,450 Not Implemented
UW0006 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $2,289 $3,340 Implemented
UW0006 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,403 $4,470 Implemented
UW0006 # 04 Y:2007 04 2007 OPTIMIZE PLANT POWER FACTOR $3,834 $12,330 Not Implemented
UW0006 # 03 Y:2007 03 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $6,191 $10,550 Not Implemented