Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,712
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2505 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM THICKNESS INSULATION | $950 | $3,710 | n/a |
UW2505 # 04 Y:2025 | 04 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $55,282 | $123,500 | n/a |
UW2505 # 03 Y:2025 | 03 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $20,963 | $191,676 | n/a |
UW2505 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,747 | $15,000 | n/a |
UW2505 # 05 Y:2025 | 05 | 2025 | INSULATE FEEDWATER TANK | $815 | $443 | n/a |
UW2505 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $30,117 | $4,550 | n/a |
UW2503 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $52,839 | $2,112 | n/a |
UW2503 # 02 Y:2025 | 02 | 2025 | INSULATE FEEDWATER TANK | $1,063 | $489 | n/a |
UW2503 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,132 | $25,000 | n/a |
UW2503 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $19,848 | $210,600 | n/a |
UW2503 # 01 Y:2025 | 01 | 2025 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $22,742 | $12,849 | n/a |
UW2502 # 01 Y:2025 | 01 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,373 | $13,260 | n/a |
UW2502 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $332 | $2,872 | n/a |
UW2502 # 05 Y:2025 | 05 | 2025 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,383 | $20,158 | n/a |
UW2502 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $5,248 | $31,835 | n/a |
UW2502 # 03 Y:2025 | 03 | 2025 | INCREASE EFFICIENCY OF TRUCKS | $10,938 | $114,250 | n/a |
UW2501 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,682 | $32,756 | n/a |
UW2501 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $41,957 | $25,000 | n/a |
UW2501 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $83,082 | $9,800 | n/a |
UW2501 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $8,699 | $6,545 | n/a |
UW2501 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,175 | $10,269 | n/a |
OR0800 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,775 | $10,104 | n/a |
OR0800 # 01 Y:2024 | 01 | 2024 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,407 | $0 | n/a |
OR0800 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,219 | $9,036 | n/a |
OR0800 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $77,631 | $300,000 | n/a |