IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0193 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,796 $0 Implemented
OR0193 # 09 Y:1993 09 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,099 $39,000 Implemented
OR0193 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $158 $425 Implemented
OR0193 # 07 Y:1993 07 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,806 $1,000 Implemented
OR0193 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $893 $4,913 Not Implemented
OR0193 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,170 $5,000 Implemented
OR0193 # 06 Y:1993 06 1993 OPTIMIZE PLANT POWER FACTOR $2,954 $9,000 Not Implemented
OR0193 # 08 Y:1993 08 1993 AIR CONDITION ONLY SPACE NECESSARY $6,042 $6,116 Implemented
OR0193 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,033 $7,596 Not Implemented
OR0192 # 05 Y:1993 05 1993 OPTIMIZE PLANT POWER FACTOR $2,478 $7,050 Implemented
OR0192 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,496 $3,000 Implemented
OR0192 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,115 $2,857 Implemented
OR0192 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,631 $30,340 Implemented
OR0192 # 02 Y:1993 02 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,000 $1,700 Not Implemented
OR0192 # 01 Y:1993 01 1993 KEEP BOILER TUBES CLEAN $26,620 $4,000 Implemented
OR0182 # 05 Y:1993 05 1993 OPTIMIZE PLANT POWER FACTOR $1,458 $2,700 Implemented
OR0182 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $200 $994 Implemented
OR0183 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $2,812 $2,841 Not Implemented
OR0182 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $10,185 $10,923 Not Implemented
OR0182 # 03 Y:1993 03 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $445 $750 Implemented
OR0182 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $1,359 Not Implemented
OR0183 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $473 $430 Implemented
OR0183 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,413 $1,500 Not Implemented
OR0183 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $9,973 $13,875 Implemented
OR0183 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $444 $740 Implemented