IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0121 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,568 $12,240 Implemented
WM0121 # 04 Y:2018 04 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,055 $52,350 Not Implemented
WM0121 # 03 Y:2018 03 2018 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $25,239 $23,000 Not Implemented
WM0121 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,043 $20,000 Implemented
WM0121 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $34,154 $54,000 Not Implemented
WM0115 # 01 Y:2017 01 2017 USE SYNTHETIC LUBRICANT $11,231 $17,756 Not Implemented
WM0115 # 03 Y:2017 03 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $7,532 $17,600 Not Implemented
WM0115 # 02 Y:2017 02 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,812 $810 Not Implemented
WM0115 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $3,740 Not Implemented
WM0115 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $212 $550 Not Implemented
WM0084 # 10 Y:2016 10 2016 USE SYNTHETIC LUBRICANT $1,724 $630 Not Implemented
WM0084 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,124 $83,912 Implemented
WM0084 # 04 Y:2016 04 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,145 $0 Not Implemented
WM0084 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $1,819 $409 Not Implemented
WM0084 # 11 Y:2016 11 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,465 $0 Implemented
WM0084 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $4,032 $9,450 Not Implemented
WM0084 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,605 $1,900 Implemented
WM0084 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $17,305 $34,684 Not Implemented
WM0084 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,103 $400 Implemented
WM0084 # 13 Y:2016 13 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $101 $402 Not Implemented
WM0084 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $866 $1,988 Implemented
WM0084 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,763 $15,500 Not Implemented
WM0084 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,665 $0 Implemented
IC0185 # 02 Y:2011 02 2011 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $66,621 $315,096 n/a
IC0185 # 07 Y:2011 07 2011 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $260,354 $102,100 n/a