IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0484 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,240 $500 Not Implemented
WI0484 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,787 $400 Not Implemented
WI0484 # 07 Y:2005 07 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,880 $11,000 Not Implemented
WI0484 # 08 Y:2005 08 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,010 $0 Not Implemented
WI0484 # 09 Y:2005 09 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,689 $0 Not Implemented
WI0484 # 10 Y:2005 10 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,942 $1,054 Not Implemented
WI0482 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,756 $55,500 Not Implemented
WI0482 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,773 $50,985 Not Implemented
WI0482 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,362 $3,571 Implemented
WI0482 # 04 Y:2005 04 2005 $6,615 $13,500 Not Implemented
WI0482 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,791 $640 Not Implemented
WI0482 # 06 Y:2005 06 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,495 $500 Implemented
WI0482 # 07 Y:2005 07 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $697 $1,000 Not Implemented
WI0482 # 08 Y:2005 08 2005 USE PHOTOCELL CONTROLS $617 $2,200 Not Implemented
WI0461 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,591 $14,685 n/a
WI0461 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,032 $360 Implemented
WI0461 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $0 Not Implemented
WI0461 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,930 $5,784 Not Implemented
WI0461 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,681 $1,227 Not Implemented
WI0423 # 01 Y:2002 01 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $14,059 $20,000 Not Implemented
WI0423 # 02 Y:2002 02 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,458 $500 Implemented
WI0423 # 03 Y:2002 03 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $9,308 $11,000 Not Implemented
WI0423 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,599 $12,000 Not Implemented
WI0423 # 05 Y:2002 05 2002 COVER OPEN TANKS $3,017 $864 Not Implemented
WI0423 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,966 $5,584 Implemented