IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

196

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0120 # 11 Y:2018 11 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $408 $0 Not Implemented
WM0120 # 09 Y:2018 09 2018 USE PHOTOCELL CONTROLS $793 $1,120 Not Implemented
WM0120 # 10 Y:2018 10 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $660 $405 Not Implemented
WM0120 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,520 $0 Not Implemented
WM0079 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,338 $1,470 Not Implemented
WM0079 # 09 Y:2015 09 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $221 $300 Not Implemented
WM0079 # 08 Y:2015 08 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $624 $2,210 Not Implemented
WM0079 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,542 $320 Not Implemented
WM0079 # 06 Y:2015 06 2015 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,982 $198 Not Implemented
WM0079 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,974 $150 Not Implemented
WM0079 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,526 $12,300 Not Implemented
WM0079 # 02 Y:2015 02 2015 USE SYNTHETIC LUBRICANT $8,412 $2,365 Not Implemented
WM0079 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,351 $1,600 Not Implemented
WM0045 # 05 Y:2014 05 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,440 $940 Not Implemented
WM0045 # 11 Y:2014 11 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $1,220 Implemented
WM0045 # 10 Y:2014 10 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $38 $100 Not Implemented
WM0045 # 09 Y:2014 09 2014 COVER OPEN TANKS $51 $0 Implemented
WM0045 # 08 Y:2014 08 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $313 $630 Not Implemented
WM0045 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $478 $280 Implemented
WM0045 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,114 $2,500 Not Implemented
WM0045 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,111 $2,030 Not Implemented
WM0045 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $2,701 $0 Implemented
WM0045 # 06 Y:2014 06 2014 IMPROVE SPACE COMFORT CONDITIONING $4,160 $350 Not Implemented
WM0045 # 01 Y:2014 01 2014 RECYCLE WHITE WATER $6,827 $13,958 Not Implemented
WM0012 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $771 $100 Not Implemented