Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0136 # 07 Y:2007 | 07 | 2007 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $9,042 | $26,000 | Not Implemented |
IC0136 # 05 Y:2007 | 05 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,287 | $17,000 | Not Implemented |
IC0136 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,389 | $3,105 | Implemented |
IC0136 # 03 Y:2007 | 03 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,294 | $5,851 | Not Implemented |
IC0136 # 06 Y:2007 | 06 | 2007 | REDUCE VENTILATION AIR | $23,044 | $0 | Not Implemented |
IC0136 # 02 Y:2007 | 02 | 2007 | INSTALL OCCUPANCY SENSORS | $2,224 | $5,038 | Implemented |
IC0136 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,802 | $9,080 | Implemented |
IC0132 # 08 Y:2007 | 08 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $860 | $0 | Not Implemented |
IC0132 # 01 Y:2007 | 01 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $906 | $0 | Implemented |
IC0132 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,349 | $3,349 | Not Implemented |
IC0132 # 03 Y:2007 | 03 | 2007 | OPTIMIZE PLANT POWER FACTOR | $8,296 | $19,530 | Implemented |
IC0132 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,356 | $6,527 | Not Implemented |
IC0132 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $71 | $147 | Not Implemented |
IC0132 # 06 Y:2007 | 06 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $654 | $1,962 | Implemented |
IC0132 # 07 Y:2007 | 07 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $396 | $0 | Implemented |
IC0129 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,613 | $22,008 | Implemented |
IC0129 # 08 Y:2007 | 08 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,264 | $0 | Implemented |
IC0129 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $506 | $1,782 | Implemented |
IC0129 # 06 Y:2007 | 06 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,946 | $2,902 | Implemented |
IC0129 # 05 Y:2007 | 05 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $561 | $0 | Implemented |
IC0129 # 03 Y:2007 | 03 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,183 | $4,040 | Not Implemented |
IC0129 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,611 | $1,035 | Implemented |
IC0129 # 01 Y:2007 | 01 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $14,537 | $81,554 | Implemented |
IC0128 # 06 Y:2007 | 06 | 2007 | IMPROVE SPACE COMFORT CONDITIONING | $11,886 | $10,408 | Not Implemented |
IC0128 # 05 Y:2007 | 05 | 2007 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $44,610 | $0 | Not Implemented |