IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0136 # 07 Y:2007 07 2007 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $9,042 $26,000 Not Implemented
IC0136 # 05 Y:2007 05 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,287 $17,000 Not Implemented
IC0136 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,389 $3,105 Implemented
IC0136 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,294 $5,851 Not Implemented
IC0136 # 06 Y:2007 06 2007 REDUCE VENTILATION AIR $23,044 $0 Not Implemented
IC0136 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $2,224 $5,038 Implemented
IC0136 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,802 $9,080 Implemented
IC0132 # 08 Y:2007 08 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $860 $0 Not Implemented
IC0132 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $906 $0 Implemented
IC0132 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,349 $3,349 Not Implemented
IC0132 # 03 Y:2007 03 2007 OPTIMIZE PLANT POWER FACTOR $8,296 $19,530 Implemented
IC0132 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $6,527 Not Implemented
IC0132 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $71 $147 Not Implemented
IC0132 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $654 $1,962 Implemented
IC0132 # 07 Y:2007 07 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $396 $0 Implemented
IC0129 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,613 $22,008 Implemented
IC0129 # 08 Y:2007 08 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,264 $0 Implemented
IC0129 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $506 $1,782 Implemented
IC0129 # 06 Y:2007 06 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,946 $2,902 Implemented
IC0129 # 05 Y:2007 05 2007 UPGRADE CONTROLS ON COMPRESSORS $561 $0 Implemented
IC0129 # 03 Y:2007 03 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,183 $4,040 Not Implemented
IC0129 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,611 $1,035 Implemented
IC0129 # 01 Y:2007 01 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $14,537 $81,554 Implemented
IC0128 # 06 Y:2007 06 2007 IMPROVE SPACE COMFORT CONDITIONING $11,886 $10,408 Not Implemented
IC0128 # 05 Y:2007 05 2007 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $44,610 $0 Not Implemented