IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0014 # 02 Y:1994 02 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,710 $1,540 Not Implemented
NV0014 # 08 Y:1994 08 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,226 $900 Implemented
NV0014 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $181 $0 Not Implemented
NV0014 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $597 $100 Implemented
NV0014 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $139 $172 Not Implemented
NV0014 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,613 $724 Implemented
NV0014 # 05 Y:1994 05 1994 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $105 $56 Not Implemented
NV0014 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,503 $1,059 Not Implemented
MS0015 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,747 $1,500 Not Implemented
GT0532 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $260 $210 Not Implemented
MS0015 # 01 Y:1994 01 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,248 $0 Implemented
GT0532 # 01 Y:1994 01 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,270 $4,000 Implemented
MS0015 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,919 $4,270 Not Implemented
ND0200 # 02 Y:1994 02 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,112 $1,500 Not Implemented
ND0200 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,000 $11,920 Not Implemented
ND0200 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $775 Not Implemented
GT0532 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,790 $21,850 Not Implemented
ND0200 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,431 $1,350 Not Implemented
MS0015 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $850 $277 Not Implemented
ND0200 # 08 Y:1994 08 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,979 $5,000 Not Implemented
ND0200 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,273 $1,568 Not Implemented
MS0015 # 05 Y:1994 05 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $205 $0 Not Implemented
ND0200 # 09 Y:1994 09 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,402 $5,000 Not Implemented
ND0200 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $5,177 $900 Not Implemented
GT0532 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $2,240 $1,680 Implemented