Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0230 # 01 Y:2025 | 01 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $155,302 | $120,000 | n/a |
WM0230 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,358 | $2,488 | n/a |
WM0230 # 03 Y:2025 | 03 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,667 | $900 | n/a |
WM0230 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,743 | $4,500 | n/a |
UD1097 # 02 Y:2025 | 02 | 2025 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,598 | $104 | n/a |
UD1097 # 09 Y:2025 | 09 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,544 | $0 | n/a |
UD1097 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,220 | $14,406 | n/a |
UD1097 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $296 | $0 | n/a |
UD1097 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $400 | $900 | n/a |
UD1097 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $471 | $320 | n/a |
UD1097 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,568 | $0 | n/a |
UD1097 # 03 Y:2025 | 03 | 2025 | MINIMIZE WATER USAGE | $1,616 | $0 | n/a |
UD1097 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $63,287 | $0 | n/a |
NT0036 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,170 | $16,268 | n/a |
NT0036 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,825 | $0 | n/a |
NT0036 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,972 | $5,609 | n/a |
NT0036 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $688 | $0 | n/a |
WM0228 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,416 | $0 | n/a |
WM0228 # 02 Y:2025 | 02 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,628 | $3,197 | n/a |
WM0228 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,531 | $4,430 | n/a |
WM0228 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,292 | $1,200 | n/a |
LE0584 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,871 | $0 | n/a |
LE0584 # 06 Y:2025 | 06 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,853 | $5,000 | n/a |
LE0584 # 05 Y:2025 | 05 | 2025 | INSTALL BACK-UP EQUIPMENT | $148,846 | $350,000 | n/a |
LE0584 # 03 Y:2025 | 03 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $1,504 | $600 | n/a |