Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,028
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0257 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $343 | $0 | n/a |
DL0257 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,000 | $0 | n/a |
DL0257 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,383 | $470,000 | n/a |
DL0257 # 05 Y:2025 | 05 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $291 | $131 | n/a |
DL0257 # 04 Y:2025 | 04 | 2025 | USE OPTIMUM TEMPERATURE | $1,329 | $0 | n/a |
LE0599 # 08 Y:2025 | 08 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $808 | $1,500 | n/a |
LE0599 # 12 Y:2025 | 12 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,690 | $12,500 | n/a |
LE0599 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,274 | $2,000 | n/a |
LE0599 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,397 | $22,164 | n/a |
LE0599 # 01 Y:2025 | 01 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $15,231 | $50 | n/a |
LE0599 # 04 Y:2025 | 04 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $66,584 | $25,000 | n/a |
LE0599 # 07 Y:2025 | 07 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $2,581 | $4,000 | n/a |
LE0599 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,295 | $100 | n/a |
LE0599 # 06 Y:2025 | 06 | 2025 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $98,974 | $65,000 | n/a |
LE0599 # 11 Y:2025 | 11 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $32,291 | $137,607 | n/a |
LE0599 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,855 | $7,000 | n/a |
LE0599 # 10 Y:2025 | 10 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $39,348 | $166,600 | n/a |
WV0679 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,875 | $900 | n/a |
WV0679 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $179 | $185 | n/a |
WV0679 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $283 | $25 | n/a |
WV0679 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,114 | $3,943 | n/a |
DL0256 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $589 | $3,250 | n/a |
DL0256 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,171 | $16,500 | n/a |
DL0256 # 07 Y:2025 | 07 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,219 | $5,200 | n/a |
DL0256 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,828 | $5,900 | n/a |