Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,443
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0258 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,102 | $3,500 | n/a |
DL0258 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,565 | $200 | n/a |
DL0258 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $2,112 | $5,500 | n/a |
DL0258 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,808 | $25,000 | n/a |
LS0725 # 06 Y:2025 | 06 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,995 | $8,018 | n/a |
LS0725 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $22,632 | $131,664 | n/a |
LS0725 # 05 Y:2025 | 05 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,641 | $3,740 | n/a |
LS0725 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,733 | $3,718 | n/a |
LS0725 # 01 Y:2025 | 01 | 2025 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $316 | $50 | n/a |
LS0725 # 02 Y:2025 | 02 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $17,524 | $5,306 | n/a |
LS0725 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $7,794 | $9,100 | n/a |
UU0271 # 01 Y:2025 | 01 | 2025 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $3,038 | $1,248 | n/a |
UU0271 # 06 Y:2025 | 06 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,046 | $20,000 | n/a |
UU0271 # 04 Y:2025 | 04 | 2025 | MINIMIZE WATER USAGE | $3,231 | $23,282 | n/a |
UU0271 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $771 | $5,877 | n/a |
UU0271 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,296 | $11,327 | n/a |
UU0271 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $133 | $1,175 | n/a |
UU0271 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $335 | $648 | n/a |
UU0272 # 01 Y:2025 | 01 | 2025 | Hire Energy Manager | $66,000 | $13,000 | n/a |
UU0272 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $31,500 | $18,800 | n/a |
UU0272 # 03 Y:2025 | 03 | 2025 | REDUCE EXCESSIVE BOILER BLOWDOWN | $20,800 | $16,300 | n/a |
UU0272 # 07 Y:2025 | 07 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $62,900 | $32,400 | n/a |
UU0272 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,170 | $26,600 | n/a |
UU0272 # 04 Y:2025 | 04 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $54,700 | $110,000 | n/a |
UU0272 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,950 | $23,600 | n/a |