IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0212 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,372 $212 Implemented
OK0212 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $378 $450 Implemented
OK0212 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,403 $0 Implemented
OK0212 # 01 Y:1986 01 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,745 $485 Implemented
OK0211 # 10 Y:1986 10 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,185 $476 Implemented
OK0211 # 09 Y:1986 09 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,017 $14,850 Implemented
OK0211 # 08 Y:1986 08 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,395 $1,500 Implemented
OK0211 # 07 Y:1986 07 1986 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,220 $3,500 Not Implemented
OK0211 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,305 $225 Implemented
OK0211 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $294 Implemented
OK0211 # 04 Y:1986 04 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $269 $132 Implemented
OK0211 # 03 Y:1986 03 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $688 $422 Implemented
OK0211 # 02 Y:1986 02 1986 OPTIMIZE PLANT POWER FACTOR $5,176 $10,000 Not Implemented
OK0211 # 01 Y:1986 01 1986 IMPROVE LUBRICATION PRACTICES $7,240 $0 Not Implemented
MA0080 # 03 Y:1986 03 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $93,569 $0 Not Implemented
MA0080 # 02 Y:1986 02 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $44,537 $600 Implemented
MA0080 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,100 $3,000 Implemented
MA0079 # 05 Y:1986 05 1986 USE OPTIMUM THICKNESS INSULATION $21,098 $5,000 Implemented
MA0079 # 04 Y:1986 04 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,519 $13,000 Not Implemented
MA0079 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,763 $4,700 Implemented
MA0079 # 02 Y:1986 02 1986 REPAIR OR REPLACE STEAM TRAPS $4,572 $600 Implemented
MA0079 # 01 Y:1986 01 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $478 $350 Implemented
MA0078 # 06 Y:1986 06 1986 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,610 $22,000 Implemented
MA0078 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $287 $100 Not Implemented
CO0080 # 14 Y:1986 14 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,631 $2,970 Implemented