Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0561 # 13 Y:2020 13 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $624 $0 Implemented
UF0561 # 12 Y:2020 12 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $854 $800 Implemented
UF0561 # 11 Y:2020 11 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,418 $5,192 Implemented
UF0561 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,816 $421 Implemented
UF0561 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,043 $0 Implemented
UF0561 # 08 Y:2020 08 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,057 $930 Implemented
UF0561 # 07 Y:2020 07 2020 USE COMPRESSOR AIR FILTERS $2,064 $5,898 Implemented
UF0561 # 06 Y:2020 06 2020 USE PHOTOCELL CONTROLS $7,062 $4,098 Implemented
UF0561 # 05 Y:2020 05 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,808 $1,360 Implemented
UF0561 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,358 $2,343 Implemented
UF0561 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,460 $31,240 Implemented
UF0561 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,219 $20,000 Implemented
UF0561 # 01 Y:2020 01 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $136,163 $259,600 Implemented
UF0560 # 08 Y:2020 08 2020 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $9,639 $725 Implemented
UF0560 # 07 Y:2020 07 2020 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA $134,615 $11,004 Not Implemented
UF0560 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,156 $306 Implemented
UF0560 # 05 Y:2020 05 2020 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,841 $378 Implemented
UF0560 # 04 Y:2020 04 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $2,897 $1,544 Implemented
UF0560 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $3,072 $8,274 Not Implemented
UF0560 # 02 Y:2020 02 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,454 $5,998 Implemented
UF0560 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $41,999 $359,360 Not Implemented
IP0144 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,442 $22,030 Implemented
IP0144 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $194 $195 Implemented
IP0144 # 04 Y:2020 04 2020 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $8,469 $3,263 Not Implemented
IP0144 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,747 $85 Implemented