Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,696
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0739 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $1,541 | $3,605 | Not Implemented |
CO0739 # 04 Y:2020 | 04 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,067 | $0 | Implemented |
CO0739 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $291 | $185 | Implemented |
CO0739 # 02 Y:2020 | 02 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,357 | $12,500 | Not Implemented |
CO0739 # 01 Y:2020 | 01 | 2020 | INSTALL OCCUPANCY SENSORS | $5,400 | $11,069 | Not Implemented |
CO0739 # 06 Y:2020 | 06 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,090 | $0 | Implemented |
UU0147 # 02 Y:2019 | 02 | 2019 | USE OPTIMUM THICKNESS INSULATION | $3,521 | $2,917 | Implemented |
UU0147 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,746 | $1,200 | Implemented |
UU0147 # 01 Y:2019 | 01 | 2019 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $54,000 | $300,000 | Not Implemented |
UU0147 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,081 | $1,800 | Implemented |
UU0147 # 06 Y:2019 | 06 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $130 | $0 | Implemented |
UU0147 # 07 Y:2019 | 07 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $433 | $400 | Implemented |
UU0147 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,684 | $7,000 | Implemented |
UU0146 # 01 Y:2019 | 01 | 2019 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $37,500 | $225,000 | Not Implemented |
UU0146 # 08 Y:2019 | 08 | 2019 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $231 | $1,100 | Not Implemented |
UU0146 # 05 Y:2019 | 05 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $850 | $0 | Not Implemented |
UU0146 # 06 Y:2019 | 06 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $693 | $2,575 | Not Implemented |
UU0146 # 10 Y:2019 | 10 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,482 | $1,000 | Not Implemented |
UU0146 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,035 | $350 | Not Implemented |
UU0146 # 03 Y:2019 | 03 | 2019 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,780 | $0 | Implemented |
UU0146 # 09 Y:2019 | 09 | 2019 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $97 | $75 | Implemented |
UU0146 # 02 Y:2019 | 02 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,186 | $2,000 | Not Implemented |
UU0146 # 07 Y:2019 | 07 | 2019 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $367 | $1,200 | Not Implemented |
CO0736 # 01 Y:2016 | 01 | 2016 | AVOID FROST FORMATION ON EVAPORATORS | $8,830 | $19,500 | n/a |
CO0736 # 02 Y:2016 | 02 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,940 | $5,530 | n/a |