Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1989
Principal Product PLASTIC LINED PIPES
NAICS n/a
SIC 3494 - Valves And Pipe Fittings, Nec
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 0
Annual Production 144 Thousand Feet
Production Hrs. Annual 6,000
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $261,894 4,370,457 kWh $0.06
Natural Gas $16,368 3,426 MMBtu $4.78
TOTAL ENERGY COSTS $278,262
RECOMMENDED SAVINGS* $29,646 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,186
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$8,120
Cost:
$25,000
$8,120 - - - - - $8,120
-
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,348
Cost:
$205
$4,554 109,906 - - $(-206) - $4,554
109,906
kWh
-
-
MMBtu
$(-206)
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,709
Cost:
$1,500
$4,709 177,022 - - - - $4,709
177,022
kWh
-
-
MMBtu
-
-
$
04: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$4,550
Cost:
$8,250
- - $4,550 952 - - -
-
kWh
$4,550
952
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,285
Cost:
$3,250
$2,285 85,287 - - - - $2,285
85,287
kWh
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,460
Cost:
$1,050
- - $1,460 305 - - -
-
kWh
$1,460
305
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,380
Cost:
$700
- - $1,380 290 - - -
-
kWh
$1,380
290
MMBtu
-
-
$
08: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,265
Cost:
-
$1,265 - - - - - $1,265
-
kWh
-
-
MMBtu
-
-
$
09: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,213
Cost:
$2,500
- - $1,213 - - - -
-
kWh
$1,213
-
MMBtu
-
-
$
10: 2.7493 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES Savings:
$86
Cost:
$81
$86 1,172 - - - - $86
1,172
kWh
-
-
MMBtu
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$230
Cost:
$410
$230 8,792 - - - - $230
8,792
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$29,646
Cost:
$42,946
$21,249 382,179 $8,603 1,547 $(-206) - $21,249
382,179
kWh
$8,603
1,547
MMBtu
$(-206)
-
$
TOTAL IMPLEMENTED Savings:
$28,186
Cost:
$41,896
$21,249 382,179 $7,143 1,242 $(-206) - $21,249
382,179
kWh
$7,143
1,242
MMBtu
$(-206)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes