IAC logo
IAC Assessment: AM0305
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0305
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1997
Principal Product Storage tanks, pressure vessels, plate fabrication, painting
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 78,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 4,384
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,929 1,803,341 kWh $0.05
Electricity Demand $13,153 4,363 kW-months/year $3.01
Electricity Fees $483 - $ -
Natural Gas $7,618 1,474 MMBtu $5.17
TOTAL ENERGY COSTS $108,183
RECOMMENDED SAVINGS* $115,306 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,606
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.5194 REDESIGN PROCESS Savings:
$101,500
Cost:
$110,000
- - - - - - $45,000 - - - $56,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$45,000
-
$
-
-
$
$56,500
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,350
Cost:
$9,045
- - $9,350 693 - - - - - - - - -
-
kWh
$9,350
693
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,030
Cost:
$500
$2,030 88,218 - - - - - - - - - - $2,030
88,218
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$570
Cost:
$20
- - - - $570 113 - - - - - - -
-
kWh
-
-
kW-months/year
$570
113
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$558
Cost:
-
- - - - - - - - $558 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$558
-
$
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$395
Cost:
-
$395 17,292 - - - - - - - - - - $395
17,292
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$300
Cost:
$15
$100 4,396 $200 15 - - - - - - - - $100
4,396
kWh
$200
15
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$253
Cost:
-
- - - - - - - - $253 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$253
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$200
Cost:
$95
$40 1,758 $160 12 - - - - - - - - $40
1,758
kWh
$160
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$150
Cost:
$304
$12 586 $138 10 - - - - - - - - $12
586
kWh
$138
10
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$115,306
Cost:
$119,979
$2,577 112,250 $9,848 730 $570 113 $45,000 - $811 - $56,500 - $2,577
112,250
kWh
$9,848
730
kW-months/year
$570
113
MMBtu
$45,000
-
$
$811
-
$
$56,500
-
$
TOTAL IMPLEMENTED Savings:
$13,606
Cost:
$9,884
$2,537 110,492 $9,688 718 $570 113 - - $811 - - - $2,537
110,492
kWh
$9,688
718
kW-months/year
$570
113
MMBtu
-
-
$
$811
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material