IAC Assessment: AM0315
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0315
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1998
Principal Product Custom computer snap out forms
NAICS n/a
SIC 2761 - Manifold Business Forms
Sales $5,000,000-$10,000,000
# of Employees 32
Plant Area (Sq.Ft.) 70,000
Annual Production 1,100,000,000 Pieces
Production Hrs. Annual 5,976
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,090 1,630,715 kWh $0.04
Electricity Demand $21,414 3,966 kW-months/year $5.40
Natural Gas $5,218 740 MMBtu $7.05
TOTAL ENERGY COSTS $880,284
RECOMMENDED SAVINGS* $68,240 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,320
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$50,460
Cost:
$3,000
- - - - - - $50,460 80,000 - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$50,460
80,000
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,500
Cost:
$6,500
$9,300 202,227 $2,200 407 - - - - - - $9,300
202,227
kWh
$2,200
407
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$2,990
Cost:
$48
- - - - - - - - $2,990 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$2,990
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$2,240
Cost:
$2,960
$2,240 48,652 - - - - - - - - $2,240
48,652
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$420
Cost:
$200
$190 4,103 $230 43 - - - - - - $190
4,103
kWh
$230
43
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$140
Cost:
$340
$120 2,638 $20 4 - - - - - - $120
2,638
kWh
$20
4
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
07: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$300
Cost:
$43
- - - - $300 262,800 - - - - -
-
kWh
-
-
kW-months/year
$300
262,800
Tgal
-
-
lb
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$190
Cost:
$320
$150 3,224 $40 7 - - - - - - $150
3,224
kWh
$40
7
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$68,240
Cost:
$13,411
$12,000 260,844 $2,490 461 $300 262,800 $50,460 80,000 $2,990 - $12,000
260,844
kWh
$2,490
461
kW-months/year
$300
262,800
Tgal
$50,460
80,000
lb
$2,990
-
$
TOTAL IMPLEMENTED Savings:
$51,320
Cost:
$3,583
$310 6,741 $250 47 $300 262,800 $50,460 80,000 - - $310
6,741
kWh
$250
47
kW-months/year
$300
262,800
Tgal
$50,460
80,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes