IAC Assessment: AM0318
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0318
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1998
Principal Product Underground fiberglass fuel storage tanks, fiberglass manhol
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 128,500
Annual Production 3,500 Pieces
Production Hrs. Annual 4,867
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,700 3,542,790 kWh $0.03
Electricity Demand $80,665 9,691 kW-months/year $8.32
Natural Gas $36,775 9,060 MMBtu $4.06
TOTAL ENERGY COSTS $224,980
RECOMMENDED SAVINGS* $19,975 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,480
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$11,790
Cost:
-
- - - - $11,790 2,905 - - - - -
-
kWh
-
-
kW-months/year
$11,790
2,905
MMBtu
-
-
gal
-
-
$
02: 4.2310 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$3,110
Cost:
$5,400
- - - - - - - - $3,110 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$3,110
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,430
Cost:
$160
$2,430 83,822 - - - - - - - - $2,430
83,822
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$875
Cost:
-
- - $875 159 - - - - - - -
-
kWh
$875
159
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$840
Cost:
$1,500
- - - - - - $840 1,500 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$840
1,500
gal
-
-
$
06: 2.7145 INSTALL SKYLIGHTS Savings:
$510
Cost:
$1,860
$510 17,585 - - - - - - - - $510
17,585
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$420
Cost:
$100
$420 14,654 - - - - - - - - $420
14,654
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$19,975
Cost:
$9,020
$3,360 116,061 $875 159 $11,790 2,905 $840 1,500 $3,110 - $3,360
116,061
kWh
$875
159
kW-months/year
$11,790
2,905
MMBtu
$840
1,500
gal
$3,110
-
$
TOTAL IMPLEMENTED Savings:
$15,480
Cost:
$1,760
$2,850 98,476 - - $11,790 2,905 $840 1,500 - - $2,850
98,476
kWh
-
-
kW-months/year
$11,790
2,905
MMBtu
$840
1,500
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes